Feedback Forums

Give Us Your Feedback

You've used all your votes and won't be able to post a new idea, but you can still search and comment on existing ideas.

There are two ways to get more votes:

  • When an admin closes an idea you've voted on, you'll get your votes back from that idea.
  • You can remove your votes from an open idea you support.
  • To see ideas you have already voted on, select the "My feedback" filter and select "My open ideas".
(thinking…)

Enter your idea and we'll search to see if someone has already suggested it.

If a similar idea already exists, you can support and comment on it.

If it doesn't exist, you can post your idea so others can support it.

Enter your idea and we'll search to see if someone has already suggested it.

  1. Great programme

    An approach to calculating the average haul distance I suggest is to calculate the coordinates of the first moment of area of the cuts to determine the centroid of the total cut volume. Using the same code the programme could calculate the coordinates of the centroid of the fill volume. The distance between the two centroids would represent the average haul distance. Haul distance is one of the many considerations when estimating the cost of a project.

    3 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Flag idea as inappropriate…  ·  Admin →
  2. Be nice to have credits used to make the design written somewhere.

    After we unlocked a design and closed the unlock window telling us how much credits are required, there is no way to see how much was used again. Would be easier for billing because sometimes credits used area and field areas aren't exactly the same.

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Flag idea as inappropriate…  ·  Admin →
  3. CPU Only at 30% Capacity when Calculating

    My CPU only works at about 30% capacity while calculating. Having to load a big file (~400 hectare field) often is cumbersome. Is there a way to speed it up?

    - On behalf of a user in AR USA

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    planned  ·  1 comment  ·  Flag idea as inappropriate…  ·  Admin →
  • Don't see your idea?

Feedback Forums

Feedback and Knowledge Base